Friday 21 March 2014

3. What kind of media institution might distribute your media product and why?


Catchup

We have had our draft opening sequence shots reviewed and checked and we have concluded that it does not contain enough narrative. Therefore we will now add more narrative to the opening of our sequence and tell how the story all begins.
We have discussed and raised points on what we could do for it and have decided to have the victim go into the villains house and steal an important document from his house and this is why the villain hunt down the victim and chases him the kills him as these documents are important to him (documents could be incriminating and could be used to black mail him)so this gives the villain motive to go and kill the victim. the villains house. This will raise suspicion within the viewers and tell the rest of the opening sequence 

Wednesday 12 March 2014

I have used powtoon to make a animated storyboard that has brief information on what we will do and the story-line.

we went to edit the shots we got but we was disappointed as the camera with all of our opening title sequence shots we filmed on was being used by another group so we could not get the shot on to the computer. Then the next day when we  had the camera the group had left the camera with no charge so we spent our time waiting for it to charge. when the camera had charge we was having problems with the computer as it kept freezing .we have now finally got all the shots on to a computer ready to be edited.
On Thursday we had a very successful day filming our opening sequence. We all met on time at the location we agreed on, we were certainly a lot more organised than when we originally agreed to meet. Although we didn't have a confirmed location to film we instantly knew where we wanted to film our opening sequence. We chose quite a rural path to film, however there were many dog walkers around which delayed filming. Luckily it didn't delay us too much and we got all filming done on the day

Wednesday 5 March 2014

filming attempt

we could not film on the tuesday due to josh living to far away and it would of taken him to long to get down and we would not have enough time to film as sam had football training at 6 and josh could only get the for 5 so there was not enough time to film so we will do all the filming on the thursday.

Tuesday 4 March 2014

filming schedule

My group has arranged to meet and film on Tuesday 4th March at 4:30 for around one hour and a half,the next day we will look at the footage we got from filming and see if we need to improve scenes.We will go out in the Thursday 6th march to get the rest of the shots we need to finish our filming and then we have friday and onwards to edit the shots we have collected.

music



For our music i have been going over the Bane soundtrack in batman made by Hans Zimmer,i have found that the music between 1:53 till around 3:40 will be used in our opening title sequence as it has the fast pass for the running scene but then goes quiet so we could use that bit for when Sam (victim) is on the floor and Josh (villain) stands over him and then it fades out into the opening credits.

prop knife.

I have got a rubber knife of a friend so we do not have to spend money on it and it looks very realistic what is a bonus.A problem that we will come across is transporting the rubber knife from the filming location back to my house.